A network with nobody standing by

Most of your sites have nobody in them. That is exactly where the critical equipment lives. Unstaffed sites, night possessions and contractor crews, access granted for the window.

Public Transport

Access control for rail and public transport networks

A network of sites held on mechanical keys

Who is on your sites

Drivers and operational staff

Shift-based, across depots and crew rooms

Maintenance and engineering

Own and contracted, mostly at night

Infrastructure contractors

Large crews, short possession windows

Emergency services and police

Needing access without prior notice

What you are held to

NIS2 · CER · national transport security

  • Physical protection of control centres, signalling rooms and substations
  • Access to depots, tunnels and technical sites restricted and demonstrable
  • Resilience proven: who can reach a critical asset, and when it was last reviewed

Where it breaks today

  • Hundreds of unstaffed technical sites open with mechanical keys nobody can audit
  • Night possession works are arranged by phone, and access is whoever turns up with the key
  • A depot pass issued in one region still opens doors in another 5 years later
2 rail workers in safety clothing walking along the track

Nobody can tell you who holds a copy of the substation key, and the only revocation you have is a lock change. That is not a security model, it is an expense.

Public Transport

Scenario

A night possession on the line

A contractor crew has 6 hours, a defined stretch of track and 2 technical rooms. The crew is different from last night's.

The work order creates the access

The possession, the assets it covers and the window come from planning. It does not wait for a phone call to the depot.

The crew qualifies in advance

Safety competence is checked against the task days before. A lapsed certificate turns up at a desk, long before the trackside.

Open for the window only

That substation, that signal room, from 23:00 to 05:00. Nothing else on the network opens for them.

Closed at handback

The window ends and the access ends with it. The record of who was on site that night stays.

What changes

  • Technical sites move off mechanical keys. Revoking access stops meaning a lock change
  • Contractors reach the assets in their possession and nothing else on the network
  • 'Who can open this substation, and when was that last reviewed' becomes a report
Questions

Frequently asked questions

Can access be granted only for a possession window?

Yes. The work order creates the access: the assets it covers and the hours of the possession define what opens. Access ends at handback, and the record of who was on site is retained.

How does this replace mechanical keys on unstaffed sites?

By moving those sites onto electronic credentials governed centrally, revoking access stops meaning a lock change. Which credential technology fits depends on the site, and both wired and offline solutions are in scope.

Can safety competence be checked before dispatch?

Yes. Competence for the task is verified days ahead. A lapsed certificate turns up at a desk, long before the night shift.

The first step

Start with 1 site and 1 population.

You judge something that runs on your own site. Your access systems and readers stay where they are. If it earns its place, we extend it site by site.