The contractor firm does the work
Their coordinator uploads people, certificates and insurance through their own portal login. Your team stops chasing paperwork, weeks before the work starts.

Compliance stops being a filing exercise and becomes a condition of entry. The population you control least is the population you must control best.
Certificates, inductions, permits and insurance normally sit in inboxes and spreadsheets, verified at the gate by a person under time pressure. That is the wrong place and the wrong moment for the check.
Their coordinator uploads people, certificates and insurance through their own portal login. Your team stops chasing paperwork, weeks before the work starts.
Missing or expired documents block the access before someone is standing at the gate, or before they have travelled at all.
A certificate that lapses on Friday closes the access on Friday, without anyone noticing it first.
The company as well as the person. When a framework contract ends, 1 decision closes every person under it, across every site and every access system at once.
The unit, the shift, the store on their route, the berth and the hours of the call. Never the whole site by default.
Which of your suppliers can physically reach which assets, and when that was last reviewed. You filter the list instead of starting an investigation.
Pick a situation. The terminal handles both, and says why when the answer is no.
Access comes from the job order: the right areas, the right hours, and it ends when the job does.
The terminal shows what is outstanding, what can be fixed on the spot, and what only the employer can fix.
1,000+contractors a month
More than 1,000 contractors a month.
Identity read, the site's own policy checked, badge issued, all of it at the terminal on arrival.
Named references are shared under a non-disclosure agreement.
The contracting company gets its own portal login and loads its people, their certificates and its insurance itself. Everything is verified before they travel, instead of at your gate. A missing document is a problem the contractor can still fix.
The access closes on the day the certificate lapses. Expiry is monitored against the record. Nobody has to notice it first.
Yes. Access is held against the company and its contract, as well as the individual. Ending the contract closes one record and stops access everywhere that company held it.
You judge something that runs on your own site. Your access systems and readers stay where they are. If it earns its place, we extend it site by site.
One siteOne populationYour readers stay